Tes hauj lwm Cov ntaub ntawv ib puag ncig cov ntaub ntawv
LOS ANGELES TO ANAHEIM
The California High-Speed Rail Authority (Authority) announces the availability of the Los Angeles to Anaheim Project Section Draft Environmental Impact Report/Environmental Impact Statement (EIR/EIS) for the California High-Speed Rail (HSR) System. The Draft EIR/EIS has been prepared and is being made available pursuant to both the California Environmental Quality Act (CEQA) and the National Environmental Policy Act (NEPA).
The Los Angeles to Anaheim Project Section Draft EIR/EIS and associated documents will be available to the public on December 5, 2025.
The environmental review, consultation, and other actions required by applicable federal environmental laws for this project are being, or have been, carried out by the State of California pursuant to 23 U.S.C. 327 and a Memorandum of Understanding dated July 23, 2019 and renewed July 22, 2024, and executed by the Federal Railroad Administration (FRA) and the State of California. Under that Memorandum of Understanding (MOU), the Authority is the project’s lead agency under NEPA. Prior to the 2019 MOU, the FRA was the federal lead agency. The Authority is also the lead agency under CEQA.
Daim Ntawv Hais Txog Ib Puag Ncig Kev Nyab Xeeb Ib Puag Ncig / Cov Lus Qhia Txog Tej Feem Pauv Ib Ce
The Authority and FRA completed a Statewide Program (Tier 1) EIR/EIS in November 2005 as the first phase of a tiered environmental review process for the proposed California HSR System planned to provide a reliable high-speed electric-powered rail system that links the major metropolitan areas of the state and that delivers predictable and consistent travel times.
The Authority has prepared a project-level (Tier 2) Draft EIR/EIS that further examines the Los Angeles to Anaheim Project Section (project section). The approximately 30-mile project section would provide HSR service between Los Angeles Union Station (LAUS) in Los Angeles and the Anaheim Regional Transportation Intermodal Center (ARTIC) in Anaheim, and travels through the cities of Los Angeles, Vernon, Commerce, Bell, Montebello, Pico Rivera, Santa Fe Springs, Norwalk, La Mirada, Buena Park, Fullerton, and Anaheim, as well as portions of unincorporated LA County known as West Whittier-Los Nietos. New HSR infrastructure at LAUS was already approved as part of the Burbank to Los Angeles Project Section in January 2022 or is studied as part of the Los Angeles County Metropolitan Transportation Authority Link Union Station Project. This project section would connect to the HSR System’s current southern terminus located south of LAUS.
This Draft EIR/EIS evaluates the impacts and benefits of a No Project Alternative and two build alternatives: Shared Passenger Track Alternative A and Shared Passenger Track Alternative B. The Authority’s Preferred Alternative under NEPA, which serves as the proposed project for CEQA, is Shared Passenger Track Alternative A. Shared Passenger Track Alternative A proposes approximately 30 miles of new and upgraded track, overhead contact system, maintenance and traction power facilities (including a light maintenance facility at 26th Street in the City of Vernon), additional freight rail track (including storage track replacement at Hobart Yard), grade separations and roadway modifications, drainage improvements, communications towers, security fencing, relocations of and modifications to passenger train stations, and other necessary facilities to introduce HSR service into the existing Los Angeles – San Diego – San Luis Obispo Rail Corridor from south of LAUS beginning at the northern edge of U.S. Highway 101 to ARTIC. New and upgraded tracks would allow other trains to share tracks with HSR. The Preferred Alternative includes an HSR station at ARTIC.
Shared Passenger Track Alternative B would be similar to Shared Passenger Track Alternative A, but would include a light maintenance facility at 15th Street in the City of Los Angeles.
Although not included in the Preferred Alternative, the Draft EIR/EIS also evaluates an option for one intermediate HSR station, which would consist of adding an HSR station platform and station facilities at either the Norwalk/Santa Fe Springs Metrolink Station or the Fullerton Metrolink/Amtrak Station.
Consistent with the Authority’s commitment to invest in regionally important early action projects to provide early benefits to transit riders and local communities in Southern California, while laying a solid foundation for implementation of the HSR system, both Shared Passenger Track Alternatives include early action projects (grade separations; freight or passenger rail track infrastructure; and improvements at passenger rail stations), which would improve safety and provide immediate mobility and reliability benefits for existing freight and passenger rail operations. These early action projects may be implemented by the Authority in collaboration with local and regional agencies, or by those other agencies relying on this Los Angeles to Anaheim Project Section EIR/EIS in advance of the HSR system as stand-alone projects. These early action projects may also be the subject of an environmental review process completed earlier than the Los Angeles to Anaheim EIR/EIS process by other implementing entities. Additional infrastructure may be required by third parties to utilize the proposed HSR improvements, and these future improvements will be studied and approved in future environmental documents in accordance with federal and state law.
COPIES OF THE DRAFT EIR/EIS
Ntau cov ntaub ntawv teev tseg hauv qab no muaj nyob hauv hluav taws xob hauv Adobe Acrobat PDF hom, uas yuav tsum muaj Adobe Acrobat Reader lossis software zoo sib xws. Yog tias koj tsis muaj daim ntawv theej ntawm cov software dawb no, koj tuaj yeem rub tawm ntawm Adobe ntawm https://get.adobe.com/reader/. Yog tias koj twb muaj daim ntawv theej ntawm cov software no, tsuas yog nyem rau ntawm qhov txuas thiab nws yuav qhib tau.
Nco tseg: many of these files are very large and could take up to several minutes to download. Electronic copies of files that are not posted on this website can be requested by calling (877) 669-0494 or emailing Los.Angeles_Anaheim@hsr.ca.gov.
In addition to posting sections of the Draft EIR/EIS on this website, printed and/or electronic copies of the Draft EIR/EIS are available at the following repository locations during facility operating hours:
- Anaheim
- Anaheim Central Library, 500 W. Broadway, Anaheim, CA 92805
- Buena Park
- Buena Park Library District, 7150 La Palma Ave, Buena Park, CA 90620
- Commerce
- Rosewood Branch Library, 5655 Jillson St, Commerce, CA 90040
- Cudahy
- County of Los Angeles Public Library – Cudahy Library, 5218 Santa Ana St, Cudahy, CA 90201
- Fullerton
- Fullerton Public Library, 353 W Commonwealth Ave, Fullerton, CA 92832
- La Mirada
- County of Los Angeles Public Library – La Mirada Library, 13800 La Mirada Blvd, La Mirada, CA 90638
- Los Angeles
- Central Branch Library, 630 W 5th St, Los Angeles, CA 90071
- Malabar Branch Library, 2801 Wabash Ave, Los Angeles, CA 90033
- Montebello
- County of Los Angeles Public Library – Chet Holifield Library, 1060 S Greenwood Ave, Montebello, CA 90640
- Norwalk
- County of Los Angeles Public Library – Norwalk Library,12350 Imperial Hwy, Norwalk, CA 90650
- Txiv kab ntxwv
- Orange Public Library, 407 E Chapman Ave, Orange, CA 92866
- Pico Rivera
- Rivera Library, 7828 S Serapis Ave, Pico Rivera, CA 90660
- Santa Fe Springs
- Santa Fe Springs City Library, 11700 Telegraph Rd, Santa Fe Springs, CA 90670
- Vernon
- Vernon Branch Library, 4504 S. Central Ave, Los Angeles, CA 90011
- Whittier
- Los Nietos Library, 8511 Duchess Dr, Whittier, CA 90606
Printed and/or electronic copies of the Draft EIR/EIS are also available for review during business hours at the Authority’s Headquarters at 770 L Street, Suite 620, Sacramento, CA 95814, and by appointment at the Authority’s Southern California Regional Office at 355 S Grand Avenue, Suite 2050, Los Angeles, CA 90071. To make an appointment to view the documents at the Southern California Regional Office, please call (877) 669-0494. Electronic copies of the Draft EIR/EIS and technical reports are also available on request by calling the Authority office at (877) 669-0494. Electronic copies of the Tier 1 document are also available for review on request by calling the Authority office at (877) 669-0494. Please consult www.hsr.ca.gov for up-to-date information on open days/hours.
Lub Tuam Txhab tsis muaj kev ntxub ntxaug vim kev tsis taus, thiab raws li qhov kev thov, yuav muab kev pab tsim nyog los xyuas kom muaj kev sib npaug ntawm nws cov kev pab cuam, kev pabcuam, thiab kev ua ub no.
The purpose of environmental documents is to disclose information to decision makers and the public. Although the science and analysis that supports this Draft EIR/EIS are complex, this document is intended for the general public. Every attempt has been made to limit technical terms and the use of acronyms. The terms and acronyms are defined the first time they are used, and a list of acronyms and abbreviations is provided in Chapter 15 of the Los Angeles to Anaheim Draft EIR/EIS.
The Executive Summary, available in English, Spanish, and Korean consistent with applicable requirements and best practices, provides an overview of the substantive chapters. It includes a table listing the potential environmental impacts for each environmental resource topic and directs the reader to where additional information can be found in the document.
DOCUMENT ORGANIZATION
The Los Angeles to Anaheim Project Section Draft EIR/EIS consists of the following:
- Theem 1- Qhia Txog
- Theem 2 — Cov Kws Qhia Ntxiv Cov Lus Qhia
- Theem 3 — Qhov Haujlwm Ua Ntej rau Qhov Haujlwm Ntsiab Lus
EDUCATIONAL MATERIALS
- Summary for the Los Angeles to Anaheim Draft EIR/EIS
- Resumen del Borrador del Informe de Impacto Ambiental/Declaración de Impacto Ambiental (EIR/EIS) de Los Angeles a Anaheim
- 요약 로스앤젤레스-애너하임 구간 사업 행정용 초안 환경영향평가서(EIR/EIS)쪽
- Los Angeles to Anaheim Fact Sheet
- Hoja informativa de Los Angeles a Anaheim
- 로스앤젤레스-에서 애너하임까지 정보 자료
- Ntim 3 Cov Lus Qhia Rau Cov Neeg Siv
NOTICES
- Notice of Availability for the Los Angeles to Anaheim Draft EIR/EIS
- AVISO DE DISPONIBILIDAD / AVISO DE AUDIENCIA PÚBLICA Sección del proyecto Los Angeles a Anaheim BORRADOR DEL INFORME DE IMPACTO AMBIENTAL/ DECLARACIÓN DE IMPACTO AMBIENTAL
- 공청회 개최 통지/공청회 공고 캘리포니아 고속철도 환경 영향 보고서/환경 영향 평가서 초안
ONLINE OPEN HOUSE AND PUBLIC HEARING OPPORTUNITIES
Your feedback is important. As part of the public review process, the Authority is hosting a series of meetings to provide information and receive public comment on the Draft EIR/EIS. Please join us for an Open House and/or Public Hearing. All Open House meetings will feature the same information, providing details about the project alternatives and the Draft EIR/EIS. The Open House will also provide an opportunity to ask questions about the document and the public comment process. Please note that comments and questions received during the Open House portion of the meetings will not be included in the official public record. The Public Hearing portion of the meetings will include a formal public comment period during which members of the public may provide oral and written comments on the Draft EIR/EIS for inclusion in the official record.
Interpreters will be available at each event to provide Spanish and Korean interpretation services.
En la reunión se contará con intérpretes que traducirán al español para el público asistente que lo necesite.
회의에는 필요한 참석자를 위해 한국어 통역 서비스가 제공됩니다.
Below is a list of the open house and public hearing dates:
Open House – Virtual
Date: Thursday, December 11, 2025
Time: 6:00 PM – 8:00 PM
Location: Virtual via Zoom
Sau npe ntawm no: bit.ly/LA-AOpenHouse1
Open House/Public Hearing #1 – Santa Fe Springs
Date: Wednesday, January 7, 2026
Time: 5:00 PM – 8:00 PM
Public Comment: *6:30 PM – 8:00 PM
Location: Town Center Hall – Social Hall, 11740 Telegraph Road, Santa Fe Springs, CA 90670
Open House/Public Hearing #2 – Anaheim
Date: Monday, January 12, 2026
Time: 5:00 PM – 8:00 PM
Public Comment: *6:30 PM – 8:00 PM
Location: Anaheim Brookhurst Community Center – East & West Rooms, 2271 Crescent Avenue, Anaheim, CA 92801
Open House/Public Hearing #3 – Commerce
Date: Thursday, January 22, 2026
Time: 5:00 PM – 8:00 PM
Public Comment: *6:30 PM – 8:00 PM
Location: Double Tree by Hilton Hotel – Grand Ballroom, 5757 Telegraph Road, Commerce, CA 90040
Public Hearing #4 – Virtual
Date: Monday, January 26, 2026
Time: 4:00 PM – 7:00 PM
Location: Virtual via Zoom
Sau npe ntawm no: bit.ly/LA-APublicHearing
*Oral and written comments received for public record.
TSO COJ MUS SAIB
On December 5, 2025, the Authority released, for public review and comment under the CEQA and NEPA, a Draft EIR/EIS for the Los Angeles to Anaheim Project Section of the California High-Speed Rail System.
The public review and comment period begins December 5, 2025, and ends February 3, 2026. During the comment period, comments may be submitted in the following ways:
- Online via our web comment form
- By mail to Attn: Los Angeles to Anaheim Draft EIR/EIS Comment, California High-Speed Rail Authority, 355 S Grand Avenue, Suite 2050, Los Angeles, CA 90071
- Los ntawm email rau Los.Angeles_Anaheim@hsr.ca.gov with the subject line “Los Angeles to Anaheim Draft EIR/EIS Comment”
- Oral comment on the direct line for the Los Angeles to Anaheim Project Section at (877) 669-0494
- Oral and written comments at the public hearings
Please check the Authority website Events page (https://hsr.ca.gov/communications-outreach/info-center/events/) for more information, including up-to-date information on the planned open houses and public hearings and how to attend them. Spanish and Korean interpretation will be available for all meetings. All requests for reasonable accommodations and/or other language services must be made 72 hours prior to each meeting by calling (877) 669-0494. For TTY/TTD assistance, please call the California Relay Service at 711.
Koom Haum Cov Ntaub Ntawv
Ntim 1: Qhia Tawm
- Ntim 1 Npog
- Volume 1 Lub Npe Nplooj Ntawv
- Kos Npe Nplooj Ntawv
- Cov Lus Qhia
- Ntim 1 Cov Ntsiab Lus
- Ntsiab lus
- Tshooj Lus 1 Lub Hom Phiaj Xav Tau, Qhov Xav Tau, thiab Lub Hom Phiaj
- Tshooj Lus 2 Xaiv
- Tshooj Lus 3 cuam tshuam rau ib puag ncig, ib puag ncig tsim, thiab ntsuas kev ntsuas
- Nqe 3.1 Lus Taw Qhia
- Nqe 3.2 Kev Thauj Mus Los
- Tshooj 3.3 Huab Cua Kev Nyab Xeeb thiab Huab Cua Pauv Hloov
- Nqe 3.4 Suab nrov thiab Kev co
- Ntu 3.5 Electromagnetic cuam tshuam thiab Electromagnetic liaj teb
- Ntu 3.6 Kev Siv Rau Kev Siv Khoom thiab Lub Zog
- Ntu 3.7 Kev Txheeb Ze Kev Txheeb Ze thiab Qha
- Ntu 3.8 Qhia Txog Huab Cua thiab Kev Pabcuam Dej
- Ntu 3.9 Geology, Av, Seismicity, thiab Paleontological Resources
- Ntu 3.10 Cov Khoom Siv Khoom Muaj Kev phom sij thiab Khoom Pov Hwm
- Nqe 3.11 Kev Nyab Xeeb thiab Kev Nyab Xeeb
- Ntu 3.12 Ib Cheeb Tsam Kev Lag Luam thiab Cov Zej Zog
- Tshooj 3.13 Chaw Nres Tsheb, Kev Siv Av, thiab Kev Loj Hlob
- Nqe 3.14 Kev Ua Liaj Ua Teb Ua Liaj Ua Teb thiab Hav Zoov Thaj Av
- Ntu 3.15 Chaw Ua Si, Chaw Ua Si, thiab Qhib Chaw
- Ntu 3.16 Txoj Kev Zoo Nkauj thiab Zoo Nkauj
- Nqe 3.17 Cov Cuab Yeej Lis
- Nqe 3.18 Kev Loj Hlob hauv Cheeb Tsam
- Ntu 3.19 Cuam Tshuam Tej Zaum
- Tshooj Lus 4 Tshooj 4 (f) / 6 (f) Kev Ntsuas Xyuas
- Chapter 5 Community Analysis
- Tshooj Lus 6 Txoj Haujlwm Siv Nyiaj thiab Kev Ua Haujlwm
- Tshooj Lus 7 Lwm CEQA / NEPA Kev Txiav Txim Siab
- Tshooj Lus 8 Rau Lwm Txoj Kev Xaiv
- Tshooj Lus 9 Rau Tsoomfwv thiab Lub Koom Haum Kev Koom Tes
- Tshooj 10 EIR / EIS Kev Tso Tawm
- Tshooj 11 Cov Npaj Npaj
- Tshooj 12 Cov ntaub ntawv siv / Cov ntaub ntawv siv hauv kev npaj cov ntaub ntawv
- Tshooj 13 Cov Lus Txhais Cov Lus Qhia
- Tshooj 14 Index
- Tshooj 15 Cov Ntawv Txhais thiab Cov Ntawv Coob
Qhov Thib 2: Cov Kws Tshaj Tawm Ntxiv
- Ntim 2 Npog
- Volume Title Page
- Ntim 2 Cov Lus Txheej Txheem
- Appendix 1-A: Changes in Project Benefits and Impacts
- Appendix 2-A: Impact Avoidance and Minimization Features
- Appendix 2-B: Applicable Design Standards
- Appendix 2-C: Buena Park Metrolink Station Relocation and Commerce Metrolink Station Relocation Analysis
- Appendix 2-D: Station Access Methodology Report
- Appendix 2-E: Operations and Service Plan
- Appendix 3.1-A: Regional and Local Policy Inventory and Consistency Analysis
- Appendix 3.1-B: Los Angeles to Anaheim: Footprint Mapbook
- Appendix 3.2-A: Vehicle Miles Traveled Memorandum
- Appendix 3.2-B: Traffic Mitigation Locations
- Appendix 3.2-C: 2015 Baseline Conditions Traffic Counts Validation
- Appendix 3.2-D: Horizon Year 2040 Post-Mitigation Level of Service
- Appendix 3.4-A: Noise & Vibration Mitigation Guidelines
- Appendix 3.5-A: Preconstruction Electromagnetic Measurement Survey
- Appendix 3.6-A: Water Use and Energy Analysis Technical Appendix
- Appendix 3.10-A: Potential Environmental Concern Sites and Figures
- Appendix 3.11-A: Safety and Security Data
- Appendix 3.11-B: Existing and Proposed Railroad Crossings
- Appendix 3.11-C: Airport Obstructions
- Appendix 3.12-A: Relocation Assistance Benefits
- Appendix 3.12-B: Public Facility Tables
- Appendix 3.12-C: Public Facility Maps
- Appendix 3.12-D: Bikeway Maps
- Appendix 3.12-E: Business Displacement Maps
- Appendix 3.12-F: Children’s Health and Safety Risk Assessment
- Appendix 3.13-A: Existing Land Uses and Zoning of Project Temporary Uses and Permanent Acquisitions Figures
- Appendix 3.13-B: Land Use Tables
- Appendix 3.13-C: Zoning Tables
- Appendix 3.18-A: RIMS II Modeling Details
- Appendix 3.19-A: Cumulative Plans and Nontransportation Projects List
- Appendix 3.19-B: Cumulative Transportation Projects List
- Appendix 4-A: Park and Recreation Areas Evaluated for Section 4(f) Use
- Appendix 4-B: Cultural Resources Evaluated for Section 4(f) Use
- Appendix 4-C: Coordination Letters
- Appendix 6-A: High-Speed Rail Operating and Maintenance Cost for Use in Environmental Impact Report/Environmental Impact Statement Project-Level Analysis
- Appendix 6-B: Preliminary Engineering for Project Definition Record Set Capital Cost Estimate Reports
- Appendix 9-A: Comprehensive List of Public and Agency Meetings
- Appendix 9-B: Inclusive Public Engagement Plan
Qhov Ntim 3: Kev Tsim Qauv Ua Ntej rau Qhov Lus Txhais
Volume 3 muaj xws li Preliminary Engineering for Project Definition (PEPD) cov phiaj xwm, uas suav nrog kev kos duab, cov qauv, kev sib cais qib, kev siv hluav taws xob, chaw nres tsheb, thiab lwm yam. Cov phiaj xwm PEPD tau muab hauv qab no.
- Ntim 3 Cov Lus Qhia Rau Cov Neeg Siv
- Ntim 3 Cov Npog thiab Cov lej ntawm Kev Kos Duab
- Volume 3.1: General, Track Alignment, and Right-of-Way Part 1
- Volume 3.1: General, Track Alignment, and Right-of-Way Part 2
- Volume 3.2: General, Aerial Structures, Tunnels, and Retaining Walls
- Volume 3.3: General and Grade Separations Part 1
- Volume 3.3: General and Grade Separations Part 2
- Volume 3.3: General and Grade Separations Part 3
- Volume 3.3A: General and State College Grade Separations (By OCTA)
- Volume 3.4: General, Utilities, Grading/Drainage, Traction Power, and Communication Towers Part 1
- Volume 3.4: General, Utilities, Grading/Drainage, Traction Power, and Communication Towers Part 2
- Volume 3.4: General, Utilities, Grading/Drainage, Traction Power, and Communication Towers Part 3
- Volume 3.4: General, Utilities, Grading/Drainage, Traction Power, and Communication Towers Part 4
- Volume 3.5: General and Stations
- Volume 3.6: General and 15th Street LMF III and HSR Norwalk/Santa Fe Springs and Fullerton Station Options (Non-Preferred) Part 1
- Volume 3.6: General and 15th Street LMF III and HSR Norwalk/Santa Fe Springs and Fullerton Station Options (Non-Preferred) Part 2
- Volume 3.8: General and Link Union Station (Link US) by LA Metro
Ntaub Ntawv Tshaj Lij
The following Los Angeles to Anaheim Project Section Technical Reports provide technical details and serve as sources for the Draft EIR/EIS analysis. Electronic versions of the technical reports are available on request by calling (877) 669-0494.
- Kev Qhia Txog Tsheb Thauj
- Huab Cua Kev Nyab Xeeb thiab Huab Cua Thoob Ntiaj Teb Pauv Qhia Kev Tshaj Tawm
- Suab nrov thiab Kev co Kev Tshaj Qhia
- Tshaj Txog Kev Qhia Txog Tus Cuam Tshum thiab Cuam Tshuam
- Tshaj Tawm Kev Tshaj Tawm Kev Tshaj Tawm Kev Ua Lag Luam
- Cuam Tshuam Cov Khoom Muag Khoom Noj Khoom Haus Teeb Meem
- Qhia Txog Kev Nyab Xeeb thiab Kev Qhia Txog Cov Cuab Yeej Siv Dej
- Geology, Av, thiab Seismicity Technical Report
- Paleontological Cov Khoom Siv Qhia Tshaj Tawm
- Cov Khoom Siv Khoom Phem thiab Cov Ntawv Ceeb Toom Khoom Piav Qhia
- Supplement to the Hazardous Materials and Wastes Technical Report
- Kev Ntsuam Xyuas Hauv Lub Zej Zog
- Daim Ntawv Cuam Tshuam Cov Ntaub Ntawv Hais Qhia Feem
- Kev Zoo Nkauj thiab Kev Tshaj Lij Ua Zoo Tshaj Lij Ceeb
Cov lus piav qhia luv luv ntawm Txhua Tshooj
Theem 1 - Daim Ntawv Qhia
Chapter 1.0, Project Purpose, Need, and Objectives, explains why the project is proposed and provides a history of the planning process.
Chapter 2.0, Alternatives, describes the proposed alternatives and station locations as well as the No Project Alternative used for purposes of comparison. This chapter contains illustrations and maps and describes construction activities. Chapter 2 also identifies the Authority’s Preferred Alternative, which also serves as the proposed project for CEQA.
Thawj ob tshooj no pab tus nyeem kom nkag siab qhov kev tshawb xyuas hauv cov ntawv tshuav ntxiv.
Chapter 3.0, Affected Environment, Environmental Consequences, and Mitigation Measures, is where the reader can find information about the existing transportation, environmental, and social conditions in the Los Angeles and Anaheim region. This chapter provides the findings of the analysis of potential environmental impacts, along with methods to reduce these impacts (called mitigation measures).
Chapter 4.0, Section 4(f)/6(f) Evaluations, summarizes impacts on parks, wildlife refuges, and historic properties in accordance with Section 4(f) of the Department of Transportation Act of 1966 and Section 6(f) of the Land and Water Conservation Fund Act.
Chapter 5.0, Community Analysis, discusses whether the proposed alternatives would cause disproportionate impacts on low-income and minority communities. It also identifies mitigation to reduce those impacts, where appropriate
Chapter 6.0, Project Costs and Operations, summarizes the estimated capital, operations, and maintenance costs for the proposed alternatives and design options.
Chapter 7.0, Other NEPA/CEQA Considerations, summarizes the project’s significant adverse environmental effects that cannot be avoided if the project is implemented, the project’s benefits, and the significant irreversible environmental changes that would occur as a result of project implementation.
Chapter 8.0, Preferred Alternative, identifies the Preferred Alternative for the Los Angeles to Anaheim Project Section and the basis for its identification
Tshooj Lus 9.0, Pej Xeem thiab Koom Tes Kev Koom Tes, muaj cov ntsiab lus ntawm kev ua kom sib haum thiab nthuav tawm cov haujlwm nrog cov chaw lis haujlwm thiab cov pej xeem.
Chapter 10.0, EIR/EIS Distribution, identifies the public agencies, tribes, and organizations that were informed of, and locations to review, this Draft EIR/EIS.
Chapter 11.0, List of Preparers, provides the names and roles of the authors of this Draft EIR/EIS.
Chapter 12.0, References/Sources Used in Document Preparation, lists the references and contacts used in writing this Draft EIR/EIS.
Chapter 13.0, Glossary of Terms, provides a definition of certain terms used in this Draft EIR/EIS
Tshooj Lus 14.0, Qhov Kev Ntsuas, muab ib qho cuab yeej los saib xyuas cov ntsiab lus tseem ceeb uas siv nyob hauv daim Draft EIR / EIS no.
Tshooj Lus 15.0, Cov Ntawv Sau thiab Cov Ntawv Txhais, txhais cov lus txhais thiab cov tsiaj ntawv luv siv nyob rau hauv Daim Qauv EIR / EIS no.
Theem 2 - Kws Qhia Ntxiv Cov Lus Qhia
Appendices provide additional details on the proposed alternatives, the Draft EIR/EIS, and specific background information, data, and other evidence supporting the analyses. Technical appendices are primarily related to the affected environment and environmental consequences analyses. These appendices are numbered to match corresponding chapters and sections of the Draft EIR/EIS (e.g., Appendix 3.2-A is the first appendix for Section 3.2, Transportation).
Theem 3 - Kev Cim Ua Ntej rau Qhov Haujlwm Ntsiab Lus
These are detailed design drawings, including trackway, right-of-way, structures, grade separations, utilities, systems, stations, and maintenance facilities, for the two build alternatives evaluated in the Draft EIR/EIS.
- San Francisco rau San Jose Project Seem: Cov Ntaub Ntawv ib puag ncig
- San Jose rau Merced Txoj Haujlwm Project: Cov Ntaub Ntawv Ib Cheeb Tsam
- Merced rau Fresno: Environmental Documents
- Merced rau Fresno: Central Valley Wye: Environmental Documents
- Fresno rau Bakersfield: Environmental Documents
- Fresno to Bakersfield: Locally Generated Alternative: Environmental Documents
- Bakersfield rau Palmdale: Cov ntaub ntawv ib puag ncig
- Palmdale rau Burbank: Environmental Documents
- Burbank rau Los Angeles Project Section: Environmental Documents
- Los Angeles to Anaheim Project Section: Environmental Documents
Cov Lus Qhia Txog Haujlwm
Xaiv ib ntu haujlwm kom paub ntau ntxiv: