Construction Package 1 (HSR 13-06)


EXECUTED AGREEMENT: HSR 13-06

Environmental Documents

Proposal: Tutor Perini/Zachry/Parsons, a Joint Venture

Reference Materials

  • Due to size and amount, these items are available upon request.

RFP HSR11-16:  Design-Build Contract for Construction Package 1


Construction Package 2-3 (HSR 13-57)


EXECUTED AGREEMENT: HSR 13-57


Proposal: Dragados/Flatiron Joint Venture



RFP HSR 13-57: Design-Build Contract for Construction Package 2-3


RFQ HSR 13-57: Design-Build Contract for Construction Package 2-3

Construction Package 4 (HSR 14-32)


EXECUTED AGREEMENT: HSR 14-32


Proposal: California Rail Builders



RFP HSR 14-32: Design-Build Contract for Construction Package 4

RFQ HSR 14-32: Design-Build Contract for Construction Package 4